中税泰国CTAC Thailand
BOI incentives · requalifying after the CIT holiday ends

BOI CIT exemption already used up? A path back to new incentives

In short

Existing manufacturers whose BOI corporate income tax (CIT) holiday has already run out — or whose project never carried a CIT exemption to begin with — are not locked out of BOI incentives for good. Announcement 15/2565 (the Smart and Sustainable Industry measure) opens a dedicated route back in for exactly this group. It runs on five sub-measures (automation, digital technology, Industry 4.0, energy/environment, international standards) — pick one, but three shared conditions (an investment floor, filing before you buy the equipment, and having already opened operations) all have to be met, and getting the order wrong stalls the filing just as surely as missing a condition outright.

01Who this route is actually for

"Our BOI CIT holiday already ran out — are we out of options?" is a question many Chinese-invested manufacturers who have been operating in Thailand for a few years eventually ask. There is still a route. Announcement 15/2565 is built specifically for existing enterprises — whether previously BOI-promoted or not — as long as the CIT exemption/reduction has already ended, or the project never had one, and the activity category the applicant falls under is still one the Board of Investment currently promotes. Existing businesses shut out of the "no new-project promotion" track (a restriction that has recently appeared in narrow slices of a few industries — parts of steel, and aluminium casting from externally sourced scrap) can use this same route without being bound by the new-project category restriction.

02Five sub-measures, and they are not interchangeable

The measure has five sub-measures, each covering a different type of upgrade, and the incentive level and attached conditions differ — picking the wrong one stalls the filing later on:

The entry threshold — an upgrade investment of at least THB 1 million (excluding land and working capital) — is common to all five, and whichever option you take, the upgrade must be completed within 3 years of the promotion certificate date.

03Three conditions easy to overlook

The parent announcement only says applications follow "standards set by the office" — the actual standards sit in two separate official clarification letters. These three conditions are the ones most often missed, and they determine whether a filing can go forward at all: 1) the application must be submitted before the machinery or technology is purchased — judged by the import date or the asset-acquisition date. Buy first and apply later, and that investment simply does not count — there is no fix after the fact. When a client asks "we upgraded our line last year, can we still file," the answer is usually no — the upgrade plan has to be brought in at the procurement-decision stage. 2) the machinery being upgraded must be new — used equipment does not qualify. 3) an existing promoted project must have already commenced operations, on top of having its CIT exemption already ended — so qualifying for this route means checking two things, not one: has the exemption period ended, and has the operating licence already been granted.

04Two economic tests — this is not a paperwork exercise

The automation and the energy/environment sub-measures each carry a measurable, verifiable threshold set out in the official clarification letters — a written explanation alone does not clear it:

05The emissions-reduction option: one certification, two uses

The emissions-reduction option under the energy sub-measure requires registering and certifying emissions with the Greenhouse Gas Management Organization (TGO) before it can be filed. For Chinese-invested clients already facing group-level ESG reporting or EU CBAM-style carbon disclosure requirements, this is worth noting — the same TGO certification can serve both the group's carbon reporting and the BOI tax incentive, one certification effort covering two purposes instead of running two separate certification processes.

Which of the five sub-measures fits, whether the economic test can be met, and whether both the operating-licence and exemption-end conditions are already in place all need to be checked against the project's current promotion certificate terms and the notices in force — the specific thresholds and incentive details are amended from time to time. We generally recommend a review with our advisers before the upgrade plan is formally filed.

Related

Sources

  1. Board of Investment (BOI): Announcement 15/2565 on the industrial upgrade measure (Smart and Sustainable Industry), together with subsequent official clarification letters governing the energy/environment and automation sub-measures, which set out the economic tests and pre-filing conditions. Checked 2026-08.
  2. General note: the specific percentage thresholds left to "standards set by the office" under each sub-measure (how much energy reduction, what share of renewable energy, how much emissions reduction) have not been published alongside the announcement, and the renewable-energy option has separately been amended. This page does not state those unpublished or potentially changing figures; follow the Board of Investment (boi.go.th) as currently published and the terms of your promotion certificate.
Checked against the official texts by the CTAC Thailand advisory team. We track the gazettes of the BOI, the Revenue Department, the Department of Business Development and Thai Customs every week; when an official position changes, the affected pages are updated and dated.
This page is general information based on the rules in force at the date shown. Thai BOI categories, incentive conditions and foreign-investment rules change often. Before acting on any specific project, check the latest official announcement and have a formal opinion issued on your own facts.
Talk to our advisers

We will look at your own facts and tell you what the next step is.

中文版 · Chinese version